Tata Power's growth plans include steady capacity addition year-on-year, taking its current installed capacity to 26000MW by 2020.

The Company has been steadily establishing its footprints across the globe. The progress on Company's upcoming International Projects is as follows:

Partnership with SN Power

Tata Power has signed an exclusive partnership agreement with SN Power, Norway, to set up joint ventures for developing hydropower projects in India and Nepal. Tata Power and SN Power are developing Dugar hydro project and are pursuing project opportunities in the vast hydro potential available in the Himalayan region.

The partners aim to have 2000 MW under construction or in operation by 2015, and a total of 4000 MW by 2020.

240 MW Sorik Marapi Geothermal Project

The Tata Power (47.50%) led consortium along with Origin Energy Ltd., Australia (47.50%) and PT Supraco, Indonesia (5%), won the Sorik Marapi geothermal project in Northern Sumatra, Indonesia. The Sorik Marapi project is estimated to support the development of approximately 240 MW of geothermal generation capacity. The project will be developed by PT Sorik Marapi Geothermal Power (SMGP), a Special Purpose Vehicle formed by the Consortium. The project is in the exploration phase.

Acquisition of stake in Indonesian Coal Mines

Tata Power completed the acquisition of 30% equity stakes in major Indonesian thermal coal producers, PT Kaltim Prima Coal.

Tata Power has also acquired 26 per cent stake in Indonesian miner PT Baramulti Sukses Sarana Tbk (BSSR). The acquisition, done through Khopoli Investments Ltd, a wholly-owned subsidiary of Tata Power, gives Tata Power access to a part of the 1 billion tonne (BT) coal reserves held by BSSR and its subsidiary PT Antang Gunung Meratus (AGM).

International Projects Archive

Projects executed abroad

Sr. No. Project Location Owner Client Year Job Description
1 Jebel Ali 'G' - Dubai 4 x 100 MW Gas Turbines and 8 x 27300 M 3/day Desalination Plant Jebel Ali (Dubai) Dubai Electricity Board Ewbank, International Consultants (P) Ltd. 1992 - '95 Installation, Testing, Commissioning and Trial Operations of Gas Turbines with auxiliaries, Electrical and I&C System for Combined Cycle Power Plant & Desalination Plant
2 Serdang Power Plant (Operation of 3 x 136 MW Gas Turbines) Malaysia Tenega National Berhard, Malaysia 1994 Installation and precommissioning works for Gas-Turbogenerator units with associated auxiliaries including Electrical and I&C Systems

Receiving Stations / Sub-Station Projects (abroad)

Sr. No. Project Location Owner Client Year Job Description
1 33 kV Substations Abu Dhabi and Al-Ain, U.A.E. Ministry of Electricity and Water, U.A.E. Tata Projects Ltd. 1997 Construction, erection & commissioning of ten new receiving stations and modifications to fifteen existing receving stations.

Power Plant Management / Operation

Sr. No. Project Client
2 Serdang Power Plant (Operation of 3 x 136 MW GT) Tenega Nasional Berhard, Malaysia
3 Power Utility Management at Monrovia Liberia Electricity Corporation, Liberia
4 Operation of GT and ST units at Yanbu Royal Commission of Saudi Arabia