Current KSEB Soura Phase 2 Scheme
Minimum requirement
Current KSEB Soura Phase 2 Scheme
Additional cost
If slanted roof or any obstructions in roof, consumer must bear additional structural cost as per the requirement. Cost of Net Meter and Additional Cable requirement (more than 50m) is also not included in Base Price.
How to avail subsidy?
Tata Power advantages
Why go Solar